Fabora RAMS

RAMS Software for UK Steelwork Teams

Create site and workshop RAMS for steel fabrication, site welding and steel erection. Reuse company details, method steps, hazards, PPE and COSHH, then export branded PDFs or share live RAMS links.

What is Fabora RAMS?

Fabora RAMS is browser-based RAMS software for UK steelwork businesses. It helps steel fabricators, site welders and steel erectors create editable site and workshop RAMS, reuse company libraries, manage revisions, export branded PDFs and share live RAMS links. It supports drafting and issue control, but final review, suitability and approval stay with the business.

Site RAMSWorkshop RAMSSteel FabricationSite WeldingSteel ErectionBranded PDFsRevision ControlShare Links

Live product screen

Live saved RAMS records

Live product
Fabora RAMS saved records screen showing live site and workshop RAMS records, revision numbers, PDF download, duplicate, print and share link actions.

Saved RAMS records, revisions and issue actions

The live RAMS list keeps site and workshop records, revision numbers, PDF export, duplication and share links in one working view.

Workshop RAMSSite RAMSRevision control

How to start

Try the full product for 7 days

One plan with everything included. Start the 7-day free trial, build real RAMS for a week, and billing only starts if you stay.

Existing users should use Login. Fabora RAMS helps teams draft faster and issue cleaner packs, but final review, approval, and job-specific judgement still stay with your business.

“Best RAMS software I have used.”

It does what it says on the tin and saves me so much time. The best RAMS software out there for our industry.

Verified review on Trustpilot

One plan, everything included

Every Fabora RAMS customer gets the full product. Start with the 7-day free trial and decide on your own jobs before billing starts.

Fabora RAMS helps teams draft editable RAMS faster. Final review, suitability, approval and implementation remain with your business.

Buyer comparison

Fabora RAMS compared with other UK RAMS software

Fabora RAMS is built for UK steelwork teams that need site and workshop RAMS without paying for a broad enterprise safety suite. This comparison uses publicly visible pricing and feature information from provider websites, checked June 2026. Prices and features may change.

How does Fabora RAMS compare?

Fabora RAMS Pro is £24.99/month and focuses on steel fabricators, site welders and steel erectors. It includes unlimited RAMS creation, site and workshop RAMS, reusable company libraries, COSHH, revision workflow, branded PDFs and share links. Broader RAMS tools may include wider health and safety modules, AI generation, digital signatures, worker sign-ons, training registers or enterprise approval workflows at higher public starting prices.

Public pricing and feature comparison for Fabora RAMS, RAMSGen, RAMs App and HandsHQ, checked June 2026.
ProviderPublic starting priceBest fitKey featuresImportant note
RAMSGenFrom £59/monthUK construction contractors wanting AI-generated RAMSAI RAMS generation, COSHH assessment, emergency plan, worker summary, reusable templates on higher plans and digital sign-ons on higher plansBroader construction focus, not steelwork-only.
RAMs App£449 + VAT/year shown for Annual Unlimited single userSmall businesses wanting a broader health and safety document packageRisk assessments, method statements, COSHH, H&S templates, toolbox talks, HAVS, manual handling and optional digital signatureBroader H&S package with consultancy-backed content.
HandsHQTeam plans from £275/month, billed annually plus set-up fee. Unpriced individual plans exist for sole tradersLarger teams needing wider RAMS management, users, folders, approvals and integrationsMultiple users, RAMS folders, content library, COSHH library, digital signatures, approval workflow, analytics and integrations on higher plansMore enterprise and team focused than a simple steelwork RAMS workflow.

Public pricing and feature comparison for Fabora RAMS, RAMSGen, RAMs App and HandsHQ, checked June 2026.

RAMSGen

Price
From £59/month
Best fit
UK construction contractors wanting AI-generated RAMS
Key features
AI RAMS generation, COSHH assessment, emergency plan, worker summary, reusable templates on higher plans and digital sign-ons on higher plans
Note
Broader construction focus, not steelwork-only.

RAMs App

Price
£449 + VAT/year shown for Annual Unlimited single user
Best fit
Small businesses wanting a broader health and safety document package
Key features
Risk assessments, method statements, COSHH, H&S templates, toolbox talks, HAVS, manual handling and optional digital signature
Note
Broader H&S package with consultancy-backed content.

HandsHQ

Price
Team plans from £275/month, billed annually plus set-up fee. Unpriced individual plans exist for sole traders
Best fit
Larger teams needing wider RAMS management, users, folders, approvals and integrations
Key features
Multiple users, RAMS folders, content library, COSHH library, digital signatures, approval workflow, analytics and integrations on higher plans
Note
More enterprise and team focused than a simple steelwork RAMS workflow.

Comparison based on publicly visible provider information checked June 2026. Prices, plan limits and features can change. Fabora RAMS supports RAMS drafting and issue control; final review, suitability, approval and implementation remain with your business.

Made for steelwork teams that issue site and workshop RAMS regularly

Fabora RAMS is aimed at businesses where RAMS are part of live fabrication and site delivery, not occasional office admin or generic construction paperwork.

Quick read for buyers

What it is

RAMS software for steelwork businesses that need a faster, more controlled way to build and issue job-specific packs.

Best fit

Steel fabricators, steel erectors, site welders, and mixed steelwork teams issuing RAMS regularly across workshop and site work.

Why teams buy

To cut repeat drafting, keep company content organised, and send cleaner RAMS out to clients and site teams.

What it covers

Site and workshop RAMS, branded PDFs, share links, reusable libraries, and revision control in one workflow.

How to start

Start the 7-day free trial of the full product, then decide on your own jobs before billing starts.

Regular RAMS work

A strong fit when RAMS are part of weekly delivery

Built for steelwork businesses covering workshop fabrication, site welding, steel erection, lifting, delivery, and remedial work where RAMS need to move with live jobs.

Workshop and site fit

Handle both workshop and site RAMS in one system

Start from the right context for fabrication, erection, site welding, lifting, or mixed delivery work, then edit the pack around the real job.

Issue quality

Send cleaner packs out to site and clients

After internal review, export the branded PDF or share the live RAMS link through email or messaging channels without chasing the latest attachment.

Provenance

Built around real steelwork delivery

Shaped around workshop jobs, site welds, method steps, reusable company content, branded issue output, and practical issue control instead of generic construction software.

Workshop jobsSite weldingSteel erection
Steelwork fitBuilt for workshop fabrication, site welding, steel erection, and related delivery work
Cuts repeat draftingReuse customers, sites, operatives, and method presets instead of typing them back in
Cleaner issue controlKeep live RAMS, revisions, branded PDFs, and share links together after review

Product demo

Watch how to build a site RAMS step by step

See how Fabora RAMS helps you build a site RAMS document from job details, hazards, PPE and risk scoring through to review and PDF export.

Saved RAMS and revisionsCompany librariesHazard and COSHH sectionsRisk scoring and PDF output

Fabora RAMS helps teams build editable RAMS faster, but final job-specific review and approval still stays with the business.

What buyers get in the live Fabora RAMS product

The live workflow already shows the value: quicker first drafts, cleaner issue output, less repeat typing, and one place for site and workshop RAMS.

Live recordsSite or workshop setupReal screens below
  • Work from office or site in one live system

    Use Fabora RAMS in a modern browser across office and site devices without a separate app-store install.

  • Keep live RAMS, revisions, and repeat jobs under control

    Reopen live RAMS, revise them, duplicate them for similar jobs, and keep issue control in one place.

  • Start in site or workshop mode

    Start from the right context for workshop fabrication, site welding, erection work, or mixed delivery work.

  • Pull in method steps, then edit the real sequence

    Pull preset method steps into the draft, then change wording, order, and timings so the RAMS follows the real sequence.

  • Keep hazards, COSHH, PPE, and equipment in the same workflow

    Keep core supporting selections inside the same workflow instead of rebuilding those lists in separate files.

  • Saved customers, sites, contacts, and operatives

    Reuse company and project records through dropdown-led drafting instead of typing repeat details back in for every pack.

  • Export branded PDFs and share live links

    Issue cleaner output with branded PDFs and share the RAMS link through email and messaging channels after internal review.

Getting started

Set the company base once, then build each live RAMS around the job

The starting flow is simple and practical: set the company details and reusable libraries, build the first site or workshop RAMS, review it internally, then export the branded PDF or share link.

Full guide

Read the step-by-step getting-started guide

The full setup path now sits in a separate guide for new Fabora RAMS customers, covering onboarding, company setup, reusable libraries, first drafting, internal review, and issue.

Company setupReusable librariesJob-specific editing

Fabora RAMS vs copied old files and generic RAMS tools

Most buyers are comparing against copied old RAMS packs, Word or PDF templates, or broader generic tools. Fabora RAMS is a closer fit for steelwork teams that want faster drafting and cleaner issue control.

What buyers compareFabora RAMSCopied old files and generic tools
Built around steel fabrication, site welding, and erection workYes. Shaped around steelwork delivery.Not always. Often broader or less trade-specific.
Start from site or workshop RAMSYes. Use the right starting point and edit from there.Often handled with copied templates or separate files.
Keep live RAMS and revisions in one placeYes. Reopen, revise, and duplicate without version hunting.Often spread across renamed files, folders, or email attachments.
Issue cleanly to clients and site teamsBranded PDFs and share links are built in after internal review.Often manual PDF exports, attachments, or workarounds.
Reuse company content on repeat jobsSaved records, presets, and supporting libraries sit in one workflow.Can rely more on copied old packs and separate admin steps.
Final review stays with the businessYes. Fabora RAMS supports drafting, not approval.Varies by tool and internal process.

Generic-tool notes are broad market patterns and can vary by tool. Final review, approval, and job-specific judgement still stay with your business.

Real screens from the RAMS workflow

Start with the live RAMS record list, then move through job setup, customer and site details, method editing, hazard selection, PPE, risk scoring, and supervision review. The screens show the working product and the issued output buyers are actually paying for.

Workshop jobsSite weldingMethod editingRisk scoring
Step 01
Site RAMSWorkshop RAMSRevision control
Fabora RAMS saved records screen showing active RAMS records, customer details, site details, revisions and quick actions.

Saved RAMS list

See live site and workshop RAMS records first

Saved records, visible revision numbering, site and workshop labels, PDF export, duplicate and share actions keep live RAMS work in one place.

See every screen, from job setup to the issued PDF
Step 02
Job detailsSite RAMSWorkshop RAMS
Fabora RAMS method statement job setup screen showing RAMS type, trade pack, description of works, site, location, start date and assessor fields.

Job setup

Start with the job, place and timing

The RAMS starts from the real task, using saved company, customer, site and operative records where possible, while keeping every field editable.

Step 03
Customer recordsPermitsEquipment
Fabora RAMS setup screen showing saved customer, site contact, permit selections and plant and equipment sections.

Customer and site setup

Pull in saved customer, site and permit details

Saved customers, contacts and sites reduce repeat typing, while permit and equipment sections help shape the RAMS around the actual work.

Step 04
Method stepsTime estimatesPreset steps
Fabora RAMS method of work editor showing ordered task steps, preset method step insertion, estimated task times and total job time.

Method editing

Edit the method sequence around the real job

Insert saved method steps, change the wording, adjust the order and keep estimated task times visible before review.

Supporting proof

The remaining screens add proof around hazard selection, PPE, risk scoring, supervision, and final review before issue.

Step 05
HazardsControlsCompany library
Fabora RAMS hazard selection screen showing selected hazards for welding, power tools, fire risk, fumes, noise and site access.

Hazard selection

Select the hazards that apply to the job

Choose only the relevant hazards for the RAMS, with company-specific hazards available alongside the base Fabora hazard library.

Step 06
PPESite controlsEditable
Fabora RAMS PPE selection screen showing auto-suggested PPE and editable safety equipment for a site welding task.

PPE selection

Review suggested PPE before issue

PPE is suggested from the job details, hazards and equipment, but users can deselect anything not needed and add extra task-specific items.

Step 07
Risk matrixInitial riskResidual risk
Fabora RAMS risk scoring screen showing likelihood and severity matrix, initial scores, residual scores and overall job risk assessment.

Risk scoring

Review initial and residual risk before issue

The live risk matrix shows how selected hazards score before and after controls, helping the team review the risk position before the RAMS goes out.

Step 08
SupervisionEmergency proceduresReview
Fabora RAMS supervision and review screen showing saved operatives, supervisor selection, monitoring notes, site inductions and emergency procedures.

Supervision and review

Check supervision, inductions and emergency notes

Add saved operatives, confirm supervision arrangements and review emergency procedure wording before the RAMS is issued.

Reusable libraries

Reusable company libraries inside Fabora RAMS

Saved customers, operatives, method steps, COSHH, PPE, equipment and hazards help teams avoid typing the same details back in for every RAMS.

Fabora RAMS customer library screen showing saved customers, sites and linked contacts used to auto-fill RAMS.

Saved customers, sites and contacts

Customer and site records can be reused inside new RAMS instead of typing the same project details repeatedly.

Fabora RAMS method step library showing saved reusable method statement steps for repeat site and workshop tasks.

Reusable method statement steps

Company method steps can be saved once, pulled into a RAMS, then edited around the actual job.

Fabora RAMS COSHH library screen showing saved product and substance categories for use in RAMS.

COSHH product and substance library

COSHH products and substances can be grouped, saved and reused when they are part of the RAMS.

Display and output proof

See the same Fabora RAMS workflow in dark mode, light mode, and issued PDF output

These examples show the product working cleanly across display preferences, then turning into issued output your team can export or share after internal review.

Light mode
Light modeIssue actions
Fabora RAMS saved records screen shown in light mode with records, filters and issue actions.

Light mode saved RAMS workspace

The same saved records, filters and issue actions are available in light mode for office or site use.

Issued output

These screenshots show examples of the RAMS output buyers can export or share after internal review. Final review, approval, and job-specific judgement still stay with your business.

Fabora RAMS branded PDF output preview showing example issued RAMS pages prepared for steelwork delivery.
Issued PDF

Example of the issued RAMS output

This is the kind of branded PDF output teams can export or send on after internal review.

Fabora RAMS exported PDF page showing the risk matrix and job risk scoring for an issued RAMS pack.
Risk matrix page

Risk matrix view in the exported pack

The issued PDF can carry the job risk matrix alongside the wider RAMS pack so reviewers and site teams see the same output.

Why steelwork teams find it easier to run day to day

No big claims here. It is simply a more controlled way to draft, review and issue RAMS across repeat workshop and site jobs.

Steelwork fit

Built around steel fabrication, site welding, and erection work

Fabora RAMS is aimed at steelwork businesses that need RAMS software shaped around fabrication, erection, site welding, and related delivery work rather than generic construction admin.

Repeat work

Keep repeat RAMS work moving without copied old packs

Reuse customers, sites, operatives, presets, and supporting libraries so the next draft starts from a controlled base instead of a renamed file.

Issue quality

Present RAMS more cleanly when they leave the business

Live records, revision numbering, branded PDFs, and share links make it easier to control what is issued and what version people are looking at.

What it does and does not claim

Clearer drafting without taking review away from your team

Fabora RAMS helps teams produce cleaner first drafts and more consistent packs, but competent review, approval, and job-specific judgement still stay inside your business.

Drafting supportInternal review still requiredNo compliance guarantee

Also listed on SourceForge

Using Fabora RAMS? Leave a review and help other UK fabrication and site-work businesses find us.

Free RAMS, risk assessment and method statement guides

If you are still comparing templates, method statements or welding risk assessment examples, these free Fabora guides explain the basics in plain English before you try the RAMS builder.

  • RAMS Template UK

    A practical UK RAMS template guide for steel fabrication, site welding, steel erection and related site-working metal trades.

  • Method Statement Template

    A steelwork-focused method statement guide covering work sequence, equipment, people, controls and review points.

  • Welding Risk Assessment Template

    A practical welding risk assessment guide covering welding hazards, fumes, fire risk, PPE, COSHH and site controls.

  • Welding Risk Assessment Checklist

    Use the free checklist tool to review welding hazards, fumes, hot works, PPE, COSHH, equipment and job-specific controls.

  • RAMS Checklist Generator

    Use the free checklist to review RAMS content before issue, then move into Fabora RAMS when you need the full editable workflow.

  • Toolbox Talk Generator

    Create a practical toolbox talk outline for welding, steelwork, hot works, COSHH, PUWER, LOLER and site-work briefings.

  • Site Welding RAMS

    Guidance for site welders and steelwork teams covering hot works, fumes, permits, PPE, fire controls and site-specific method statements.

  • Steel Fabrication RAMS Guide

    Practical RAMS guidance for fabrication workshops and site-working steelwork businesses.

  • Hot Works Permits

    A guide to hot works permits, fire precautions, fire watch, site welding controls and permit close-out checks.

Soft next step

Ready to move beyond copied files?

Fabora RAMS helps steelwork teams prepare editable RAMS faster using reusable company details, hazards, PPE, COSHH, equipment and method steps. Each document can still be reviewed and edited around the real job before issue.

These guides are general guidance only. Final review, suitability and approval remain with your business.

Choosing RAMS software for steelwork teams

Compare editable RAMS software, copied templates, generic RAMS tools and larger EHS suites before choosing the right route for your steelwork business.

Best RAMS Software for Steel Fabricators

A practical guide to what UK steel fabricators, site welders and steel erectors should look for when choosing RAMS software.

RAMS Software Comparison for Steelwork Businesses

Compare Word and PDF templates, generic RAMS software, full EHS suites and Fabora RAMS for UK steelwork teams.

Fabora RAMS helps teams build editable RAMS faster. Final review, suitability and approval stay with the business.

Useful reading around RAMS structure, workshop controls, and site delivery

These guides help buyers and operational teams think through the practical issues that sit around RAMS drafting in fabrication, workshop welding, and site work.

RAMS basics

RAMS guide

What RAMS mean in practical terms, who normally uses them, what a workable pack covers, and where steelwork teams often go wrong.

RAMS drafting

Workshop RAMS vs site RAMS

Why workshop and site RAMS need different detail, where one generic draft goes wrong, and how trade teams can choose a better starting point.

COSHH

COSHH and consumables

A practical overview of COSHH for steelwork teams dealing with fumes, gases, consumables, cleaners, sprays, and related material handling.

Fabora RAMS FAQ

RAMS questions, answered plainly

Short answers on what RAMS means, when one is needed, what Fabora RAMS is built for, and where review responsibility stays.

Still weighing it up?

Product scopeTrade fitReview responsibility
What is Fabora RAMS?

Fabora RAMS is RAMS software for UK steel fabricators, steel erectors, site welders, and related site-working metal trades. It is built for repeat site and workshop RAMS work where teams want faster drafting, clearer job-specific editing, and cleaner issue control.

Who is Fabora RAMS built for?

It is built for UK steelwork teams preparing RAMS around fabrication, delivery, erection, site welding, and related site-working tasks. It is not positioned as generic office document software for occasional users.

What does Fabora RAMS include today?

Fabora RAMS includes site and workshop RAMS, live records with revision control, duplicate workflow, job setup, reusable method presets, hazard, COSHH, PPE, and equipment libraries, saved customers, sites, contacts, and operatives, branded PDF exports, shareable links, and dropdown-led reuse.

Does Fabora RAMS work in the browser on desktop, tablet, and mobile?

Yes. Fabora RAMS works in a modern browser on desktop, tablet, and mobile.

Can Fabora RAMS handle both site and workshop RAMS?

Yes. Fabora RAMS includes separate site and workshop RAMS modes so teams can start from the right context and then edit the pack around the actual job.

How much does Fabora RAMS cost and how do buyers start?

Fabora RAMS has one public plan at £24.99/month with everything included. New buyers start with a 7-day free trial of the full product, and billing starts after the trial unless it is cancelled from the app billing area first. Existing users should use Login.

Does Fabora RAMS guarantee compliance or approval?

No. Fabora RAMS is a practical drafting tool. Final review, suitability, approval, and project-specific judgement still stay with your business.

What is RAMS?

RAMS stands for Risk Assessment and Method Statement. It is a single safety document that sets out the hazards on a job, the controls that reduce them, and the step-by-step method for doing the work safely. On steelwork jobs, RAMS are commonly asked for by main contractors and clients before fabrication, site welding or steel erection starts.

Is a RAMS legally required?

UK law does not name the word RAMS, but it does require a suitable risk assessment under the Management of Health and Safety at Work Regulations 1999, and a safe system of work. In practice, most construction and steelwork clients ask for written RAMS before work begins, so they are treated as a practical requirement on site. Fabora RAMS helps you draft these documents, but final review, suitability and approval stay with your business.

What is the difference between a risk assessment and a method statement?

A risk assessment lists the hazards on a task, who could be harmed, and the controls that reduce the risk. A method statement describes the safe sequence of work step by step, including equipment, people and timings. RAMS combines both in one pack, which is why Fabora RAMS builds the hazards, controls and method steps together for site and workshop work.

How does Fabora RAMS compare with HandsHQ, RAMS App and RAMSGen?

Fabora RAMS is focused on UK steelwork teams such as steel fabricators, site welders and steel erectors. It is designed for editable site and workshop RAMS, reusable company libraries, revision workflow, branded PDFs and share links at £24.99/month for Pro. HandsHQ is more team and enterprise focused, RAMS App is a broader health and safety document package, and RAMSGen focuses on AI-generated RAMS for UK construction contractors. Prices and features can change, so buyers should check the provider's current plan details before choosing.

Also from Fabora

LEV Ready by Fabora

LEV Ready is the Fabora product for LEV and extraction asset records across sites, areas, and assets, with QR labels, checks, service history, corrective actions, and due work in one flow.

LEV recordsQR labelsDue work dashboard

Why it sits alongside RAMS

Different workflow, same practical Fabora approach

Fabora RAMS handles job-specific RAMS drafting and issue control. LEV Ready handles extraction asset records, scheduled checks, record history, and follow-up. Teams that need both can keep each workflow clear instead of forcing one product to do everything.

Start your 7-day free trial.

One plan with everything included: unlimited RAMS creation, reusable libraries, cleaner issue output, and the full company workflow. £24.99/month after the trial. Existing users should keep using Login.

One plan, everything included7-day free trialRAMS software pricing